APA were instructed to prepare a 10 year Planned Maintenance Programme for each of the 16 newly constructed residential blocks and associated car parks on the Peartree Estate. This required the whole team to be involved with the site surveys, measurements, calculations, and reports. The instruction also included for the preparation of a Reinstatement Cost Assessment for Insurance Purposes for each of the blocks.